Mongolia Burojut 2×150MW thermal power plant supporting primary, secondary fans and induced draft fans

Mongolia Burojut 2×150MW thermal power plant supporting primary, secondary fans and induced draft fans

Jun 26, 2025

The first phase of the Mongolia Burojut 2×150MW thermal power plant is operating efficiently. The primary fan, secondary fan and induced draft fan of this project are all designed and supplied by our company.

At present, the equipment is running smoothly, and the performance of various data is excellent, which has won high praise from customers. At the same time, the second phase project is about to be put into use, and the production of fan equipment is also in full swing.
Thank you for your trust and choose SIMO BLOWER.

How to extend the life of centrifugal fans in high dust and harsh environments?
Smart Operation—High-Precision Cutting Technology

Recent Posts