May 21, 2025
On May 15, a delegation of terminal owners from the Northwest Electric Power Association of China Electric Power Engineering Consulting Group visited our company and carried out a one-day acceptance inspection of the large induced draft fan purchased for the newly built 1×870 tons per day garbage incineration line in Sao Paulo, Brazil.
Our company attaches great importance to this, and the leaders of the sales department accompanied them throughout the process, fully ensuring the smooth progress of the acceptance inspection with professional and meticulous services.
After strict inspection and testing, the working group unanimously agreed that the Cima brand large induced draft fan provided by our company has reached or exceeded the contractual standards in terms of design, manufacturing, performance indicators, and process level. The product quality is reliable, and it has demonstrated the industry's advanced level in detail processing and technological innovation. It fully meets the use requirements of the Sao Paulo waste incineration line in Brazil, and fully affirms the product quality and technical strength.
The successful completion of this acceptance is not only a strong verification of the quality of our company's products, but also lays a solid foundation for the deepening of cooperation between the two parties, marking a new stage in the cooperation between the two parties.
October 26, 2016
The Most Successful Engineering ContractorSep 19, 2025
Possible problems in centrifugal fan selection?